ASTM Tested and Patented Composite

• 66% less Concrete Than Traditional Tilt
• 40% faster Erection times
• Apply insulation and drywall directly to system

Insulation ready tilt up walls

• Interior utilities install within panels
• No spread footing or concrete pour strips
• Forming, Reinforcing, and Labor is reduced

Known Structural Values

• Wire mesh embedded in concrete
• Light Guage Metal Studs
• Panels ready to lift after 48 hours of pour

  • Better, Faster, Smarter
    Click here to find out what make the FirstUp Structures process Better, Faster and Smarter...
  • What is FirstUp Structures?
    FirstUp Structures, Inc. A technology breakthrough of a 16ga. structural metal stud combined with embedded structural...
  • FirstUp Advantages
    FirstUp Advantages FirstUp offers a significant competitive advantage when constructing an aesthetically pleasing yet solid and energy...

all services

News & Events

archive